site stats

Rig move checklist

Webduring rig move operations along with methodologies that can be used to produce real-time guidance during operations. Using the same monitoring system, motions data can be gathered while the jackup is elevated on site to get measurements of response characteristics such as natural period and leg foundation fixity. Soils and Foundations WebA skilled rig mover like GAC Marine has the resources and plenty of operational experience in handling both on- and off-shore rig moves. That experience goes back to the 1970s …

General Instruction Manual: Content PDF Crane (Machine) Drilling Rig

WebChecklists Pre-spud Rig move preparation Checklist Rig move preparation Checklist The ability to monitor and circulate the well must be retained until the seal flange and lower … A network plan for the movement of the electrical rig is drawn showing explicitly the dependency relationships among the activities during rig … See more The planning and sequence of operations have been divided into the following 12 steps: 1. Determination of Rig location 2. Perform soil and seabed survey 3. Geotechnical … See more Drilling units/rigs are designed to move from one location to another location for undertaking drilling/workover operations after completing operations at an earlier location. As soon as … See more old steph curry https://sienapassioneefollia.com

Rig move training Jack-up basics Part 1 - YouTube

WebVideo training designed to simplify and explain the process of rig move to ratings who never worked on a jack-up. Usually not much time or effort is spent explaining to ratings how the vessel... WebPrior to and during any rig equipment movement, the Drilling Contractor shall make inspections and checks on crane and support equipment condition eg., trucks, forklift etc., … Webdocument with a filled in Pre rig move plan checklist as per Annexure 2, A pre-move meeting will be called by rig team . Rig move plan document shall be prepared based on the route survey, critical lifts & priority loads by 8. Rig Contractor & submitted to client for approval. is a borough a county

Rig move training Jack-up basics Part 1 - YouTube

Category:Downloads Archives - Drilling Manual

Tags:Rig move checklist

Rig move checklist

Rig Move Plan Checklist - blogs.post-gazette.com

WebMar 30, 2010 · Listed below are some very basic safe rigging practices: When rigging, make sure the load hook and upper suspension form a straight line. The chain or body of the hoist should never come in contact with the load. Never tip-load hooks. Always use a sling or lifting device to rig around loads and use engineered lift points for attachment.

Rig move checklist

Did you know?

WebOur Naval Architects and Engineers provide all type s of analyses required for Rig Move Operations and Location Approvals including Site S pecific A ssessments and Certificates … WebC.2.4 BOP handling systems that are either permanently installed on the rig or are an independently supported system that is not physically attached to the rig. C.2.5 BOP handling systems that are provided under contract by a third party service organization who represents such equipment an d systems as being designed and used specif -

WebFeb 8, 2024 · Inspect all equipment that is to be used in the rig up operation. Especially inspect all rigging equipment (hoisting line, slings, chains, hooks and cables) before using. If the equipment appears worn or frayed, inform the driller/toolpusher (or truck pusher). WebJul 21, 2024 · Rig checklist – Communication/ Documentation Important checklist required during, before and after the rig move · Vehicle Inspection · Driver Competency · Permits …

WebCDC Web1 Manriding is the last option 2 Environmental conditions suitable for performing Man-riding Activities 3 PTW along with TRIC card prepared & issued. 4 Is it confirmed that travelling equipment are stopped before connecting winch wire. Is it agreed that The Tool pusher shall supervise the task on rig floor and Only Driller or AD 5

WebAug 29, 2024 · 1 Rig Acceptance Lower KellyCock 2 Rig Acceptance IBOP, including the spare one on the Rig floor 3 Rig Acceptance Top drive wash pipe 4 Rig Acceptance Rotary Hoses 5 Rig Acceptance Drilling Stand Pipes 6 Rig Acceptance Rig Floor Mud Stand Pipe Manifold 7 Rig Acceptance Mud pumps manifold & discharge lines.

WebTASK TO BE PERFORMED: INITIALS 1. Ensure that you are familiar with the jacking and moving procedures as detailed in the rig's Marine Operating Manual. Ensure you are familiar with the Unit Rig Move Guidance Manual. 2. Hold pre-move meeting with client to plan next rig move. Meeting agenda and final is a borough council a district councilWebThe following information should be included in the daily rig move report to be submitted to Superintendent. Onshore Rig Move. Date; Old location; New location; Total loads; Loads moves % Rigged up % Rigged down; Rig Move distance; Equipment for rig move: Cranes and forklist at old locations (nb and type) Cranes and forklist at new locations ... oldstewart.comWebRig Move Drilling Contractor Inspection Requirements Prior to and during any rig equipment movement, the Drilling Contractor shall make inspections and checks on crane and support equipment condition eg., trucks, forklift etc., and proposed route conditions including bridges, bends, road gradients, road signs and villages. is a borough the same as a county